For the soldiers who had seen their comrades killed by German aircraft on the beaches, this strategic calculus offered limited comfort. The frustration with the RAF expressed by Dunkirk veterans was real and persistent, and it contributed to a tension between the services that was noted at higher command levels.

 

## Day by Day: The Operation’s Progress

 

The nine days of Operation Dynamo did not proceed at a uniform pace. The operation accelerated significantly after its slow beginning, as the improvisations around the East Mole and the small boat ferry operation took effect.

 

Day one, May 26, produced approximately 8,000 evacuees. The operation was still organizing itself, the routes were being tested, and the full scale of the small boat mobilization had not yet developed. The figure was far short of what would be needed to evacuate the entire force.

 

By May 28, the daily rate had increased substantially. The East Mole was being used continuously, ships were queuing to load at both the mole and offshore from the beaches, and the small boat ferry operation was beginning to function. French and Belgian forces were also entering the perimeter from the east and joining the queue for evacuation.

 

The peak day of the evacuation was May 31, when approximately 68,000 men were taken off in a single day — a figure that would have seemed impossible in the planning phase. The combination of the mole, the beach ferrying, and the accumulated fleet of small and large vessels operating together produced this rate.

ADVERTISEMENT
Advertisement
Share.